Resource-loaded EPC schedule
Deliverable: A schedule of at least two hundred activities with a proper WBS, relationships, calendars and resource assignments, with the critical path identified and explained.
Course
The scheduling standard on EPC and infrastructure projects — WBS, critical path, resource loading, baselines and earned value reporting a client will hold you to.
6 modules · 2 months
Deliverable: A schedule of at least two hundred activities with a proper WBS, relationships, calendars and resource assignments, with the critical path identified and explained.
Deliverable: The same schedule baselined and updated with two months of actual progress, producing a variance report showing what slipped and the effect on the finish date.
Deliverable: An earned value analysis with SPI and CPI computed, presented with a written interpretation of what the indices mean for this project and what should be done.
Deliverable: A schedule that is behind, re-planned to recover, with the changes to logic, durations or resources documented and their cost implications acknowledged.
Every student gets placement assistance — that is what 100% placement assistance means. It is support for all, not a job for all. We do not promise a specific salary, a specific number of interviews, or placement at any named company, and you should be wary of anyone who does.
On an EPC project, the programme is not an internal planning aid. It is attached to the contract, reviewed monthly by the client, and used to argue about delay and money.
That changes how it must be built. Logic has to be defensible. Durations have to be justifiable. Progress has to be recorded against a baseline nobody quietly edited. This course is built around a schedule that will be scrutinised by somebody looking for a reason not to pay.
It appears, somebody finds it alarming, and the quickest fix is to delete the constraint that caused it.
That does not make the project achievable, it only makes the warning disappear. Negative float means the plan cannot meet a date it has been given, and the honest responses are to change the plan or to renegotiate the date. Learning to resist the third option is part of becoming a planner.
Software will accept any number you type.
A planner who has watched a slab get poured writes ten days where somebody reading a productivity table writes six, and the difference shows up three months later as a claim. Site engineers moving into planning are the most successful route into this role for exactly that reason, and if that is you, the experience is an advantage rather than a gap.
On large EPC and international contracts, SPI and CPI appear in the monthly report and the client asks about them.
On a small domestic project, rarely. Knowing it is a differentiator for the larger contractors — which are also the ones that employ planning engineers properly and pay them accordingly.
Questions
Both do critical path scheduling. Primavera handles very large multi-project portfolios, has stronger resource and cost control and is the contractual standard on EPC, oil and gas and major infrastructure. MS Project is more common in IT, manufacturing and mid-sized construction. The concepts are the same, so knowing one makes the other largely a matter of relearning the interface.
It helps enormously, because a schedule is a set of assumptions about how work will actually be done. Someone who has watched concrete get poured writes better durations than someone who has not. Site engineers moving into planning are the most common and most successful route into this role.
It means the schedule cannot meet an imposed date — an activity has less time available than it needs. It usually appears after somebody applies a hard constraint. It is a genuine warning rather than a display quirk, and the correct response is to fix the plan or renegotiate the date, not to remove the constraint so the number goes away.
On large EPC, infrastructure and international contracts, routinely — SPI and CPI appear in monthly client reports. On smaller domestic projects it is less common. Knowing it is a differentiator for the larger contractors, which are also the ones paying planning engineers properly.
Three details is all we need. A course advisor will call you back.
Project scheduling taught as planning rather than as software training — dependencies, the critical path, resource conflicts and tracking a plan once reality starts disagreeing with it.
Model-based civil design — surfaces, alignments, corridors and earthwork volumes — where changing the road changes every section, profile and quantity automatically.
Structural analysis taught with the checks that matter — realistic supports, correct load combinations, and verifying an answer before a design is issued from it.
The Excel that offices actually run on — lookup logic, PivotTables, Power Query pipelines, dashboards and enough VBA to automate the work you repeat every month.
Next step
Tell us what you want to learn and we will help you pick the right course, batch and mode.