SamyakComputer ClassesShakarpur

Course

MS Project

Project scheduling taught as planning rather than as software training — dependencies, the critical path, resource conflicts and tracking a plan once reality starts disagreeing with it.

  • Duration: 6 weeks
  • Classroom · Online live
  • Level: beginner to advanced

What you will be able to do

Who this course is for

Syllabus

6 modules · 6 weeks

  1. Module 1. Planning before software

    • What a schedule is actually for
    • Work breakdown structure and task granularity
    • Estimating durations honestly
    • Milestones, deliverables and constraints
  2. Module 2. Building the schedule

    • Creating tasks, summary tasks and milestones
    • The four dependency types and when each is right
    • Lead and lag time
    • Calendars, working time and holidays
  3. Module 3. The critical path

    • Forward and backward pass, by hand first
    • Total float and free float
    • Reading and interrogating the critical path
    • Constraints and deadlines, and why hard constraints cause trouble
  4. Module 4. Resources and cost

    • Work, material and cost resources
    • Assignment, units and the duration equation
    • Spotting and resolving over-allocation
    • Levelling, and what it does to your finish date
  5. Module 5. Tracking and control

    • Setting and protecting a baseline
    • Recording actual progress
    • Variance, earned value basics and forecasting
    • Re-planning without losing the original story
  6. Module 6. Reporting

    • Formatting a Gantt chart somebody will read
    • Built-in and custom reports
    • Exporting to Excel and PDF for circulation
    • Presenting a slipping schedule honestly

Tools and technologies you will use

Projects you will build

Where this course can take you

  • Planning Engineer
  • Project Coordinator
  • Site Engineer
  • Project Management Office Executive
  • Operations Executive

Duration, modes and fees

Duration
6 weeks
Delivery modes
Classroom · Online live
Fees
Share your details for the current fee
Fees vary by batch and delivery mode. Ask about the combined fee if you take this alongside a CAD course.

Placement assistance

Every student gets placement assistance — that is what 100% placement assistance means. It is support for all, not a job for all. We do not promise a specific salary, a specific number of interviews, or placement at any named company, and you should be wary of anyone who does.

What is included

  • A place in the monthly placement drive, held every third Saturday
  • The readiness programme every second Saturday — mock interviews and preparation
  • CV review against the specific roles you are targeting
  • Portfolio review, so your project work is presented the way a reviewer will read it
  • Access to the vacancy pool employers send directly to the Samyak network
  • Guidance on which roles realistically fit your background and which do not
  • A place in the next drive, with coaching, if you are not selected in this one

What is not included

  • Any guarantee of a job, an interview, or a particular salary
  • Placement at a named or partner company
  • Applying to jobs on your behalf
  • Support before you have completed the course and its project work
  • Visa, relocation or overseas placement assistance

The schedule is the thinking, not the file

It is possible to learn every menu in Microsoft Project and still produce a plan that is useless.

That happens when tasks are linked because they happen in that order rather than because one genuinely cannot start until another finishes, and when durations are whatever makes the end date acceptable. The software recalculates all of it faithfully, which is precisely the danger — the output looks authoritative either way.

So the first module has no software in it. Work breakdown, honest estimating and real dependencies come first, because everything the tool does afterwards is only as good as those.

Critical path by hand, once

You will do a forward and backward pass on paper before you let Project compute one.

It takes an afternoon and it is the difference between reading a critical path and trusting one. When a client asks why the finish date moved by three weeks after a two-day delay, the answer requires understanding float — and that understanding does not come from watching a bar turn red.

Levelling always costs something

Resource levelling is where most schedules quietly become fiction.

The tool will happily resolve every over-allocation and hand back a finish date months later than the one you promised. The useful skill is knowing what it did, which assumptions you can challenge, and how to explain the trade-off to somebody who only wants the original date. The second project is specified to force exactly that conversation.

Reporting a slip

Every real project slips, and the schedules that matter are the ones being tracked when it happens.

The tracking module covers baselines, variance and forecasting, and the last project is a plan four weeks into trouble. Presenting that honestly — what moved, by how much, what it means for the end date — is the part of the job that actually distinguishes a planner, and it is not a software skill.

Questions

MS Project — frequently asked questions

Do I need project management experience to start?

No. The first module covers work breakdown, estimating and dependencies as planning concepts before the software appears at all, because people who learn the buttons without the concepts build schedules that look right and mean nothing. Site and coordination experience helps but is not required.

How is MS Project different from Primavera?

Both do scheduling, critical path and resource management. Primavera is the standard on large infrastructure and EPC projects; MS Project is far more common in IT, manufacturing and mid-sized construction. The concepts transfer almost entirely, so learning one makes the other mostly a matter of finding the equivalent menu.

Can I use Excel instead?

For a short task list, yes. What Excel cannot do is recalculate a finish date when a dependency moves, find the critical path, or tell you a person is booked twice on the same day. Once a project has real dependencies and shared resources, a spreadsheet stops being a schedule and becomes a picture of one.

Will this help me get a planning engineer job?

It covers what those interviews ask about — critical path, float, levelling, baselines and variance — and the three projects give you schedules to talk through. Whether it converts depends on your sector experience as well, and we will be straight with you about that rather than implying the software alone is enough.

Enquire about MS Project

Three details is all we need. A course advisor will call you back.

By submitting, you agree to be contacted about courses and accept our privacy policy.

Next step

Talk to a course advisor

Tell us what you want to learn and we will help you pick the right course, batch and mode.

Request a callback

Three details is all we need. A course advisor will call you back.

By submitting, you agree to be contacted about courses and accept our privacy policy.